<legend id="zylth"></legend>
  • <legend id="zylth"><track id="zylth"></track></legend>
    <em id="zylth"><rt id="zylth"></rt></em>
  • <tt id="zylth"><tbody id="zylth"></tbody></tt>
  • <tr id="zylth"><sub id="zylth"><big id="zylth"></big></sub></tr>

    国语自产偷拍精品视频偷拍,久久精品中文騷妇女内射,日韩午夜福利无码专区a,欧美大片18禁aaa片免费,亚洲国产精品成人午夜在线观看,粉色午夜视频,亚洲成a人无码av波多野 ,天天拍夜夜添久久精品大


    A brief analysis of the transformation process of coating production line
    Time:2012-10-22 11:51:38

           The painting production line of the complete machine is designed by the former First Design and Research Institute of machinery Industry, which adopts the advanced and mature industrial art in China at that time, and improves the mechanization and automation level of the painting production line, so as to improve the working environment and reduce the labor intensity of workers. At the same time, it has earnestly implemented the relevant state laws and regulations, norms and standards, and worked hard to do a good job in environmental protection and occupational safety and health.


           The whole production line by line, drying, screening, drying, paint on the surface and, offline 7 station such as composition, except on and off the five stations by an organic water drying room, shielding room, water spray paint room, flow flat room and dry room of a closed production line, and workshop is separated, ensures the whole paint areas relatively clean. In addition, a complete machine cleaning section is built at one end of the workshop for secondary cleaning of the complete machine. The whole machine adopts double board ground chain transportation to improve the mechanization level.


           Process flow: water gun oil removal cleaning -- on line -- hot air drying -- shielding -- surface paint spraying -- leveling -- drying -- removing shielding -- off line.


           The operation time of each station is 45min, and the cycle time of the pipeline can be adjusted appropriately according to the actual use.


           The paint varieties are komatsu yellow acrylic polyurethane enamel and the spray gun is electrostatic mixed air spray gun.


           The coating production line can produce 2000 loaders per year when only units are arranged for production. The total number of designers in the coating workshop is 24, including 16 production workers. The average annual output of each production worker is 142 loaders.


    Second, the question raises

           After 2003, due to the country to increase the investment in infrastructure, the loader industry into the good situation of flourishing production and marketing, several major loader production enterprises have reached their maximum output record. At the same time, each manufacturer has improved the appearance quality. The paint is mainly used to color the loader. The loader's appearance color is divided into two parts, which changes the loader's single color for a long time.


           With the increase of loader output and the extensive use of exterior paint color registration, several problems occurred in the application process of complete machine coating line:

           (1) the surface spray paint tinted homework makes loader shorter time () down on a painting area, and screen instead of to shorten the time, and extension of trend, make the whole assembly line beat changed, when in low yield, but increased the waiting time for some station, yield increase and then need to be partially blocked work offline.

           (2) Due to the shortened beat of the entire production line, there is a heating process in the water mark drying room, so that the temperature just rises to the specified temperature and sometimes even does not rise to the specified temperature, it needs to be transferred to the next station, which cannot play a role at all. However, the water mark drying room is a pass-through type, and the temperature immediately drops to the ambient temperature after the door is opened.

           (3) The drying room also has the same problem as the water mark drying room, which cannot give full play to the drying role.

           (4) The door of each chamber adopts pneumatic door, the time of switch is long, fully open or completely close is about 3-5min, in the whole beat is long (45min), do not feel, after the beat is shortened it seems a little too long.

           (5) the utilization rate of the waste gas treatment device is too low, because the exhaust gas in the paint room is fully mixed with water, and the air volume is large, so the organic solvent content discharged into the atmosphere can meet the emission standards. The drying chamber USES the hot air circulation, a small part of the exhaust gas emissions, this small part of the exhaust gas may exceed the standard, so most of the production lines have added activated carbon adsorption device.


    3. Suggestions for improvement

           It is impossible to solve the above problems by using the current intermittent pass-through production line. To completely solve the above problem, only fundamentally change the production line type, or like a car factory adopted by type production line, continuous operation, every room body is longer, the whole production line without door, drying room a preliminary drying and strong cold area, and use the wind curtain interception heat, or use the Chambers and decorate, a spray room with 2-3 drying room, loader into the drying chamber immediately after spray paint, flat, drying in the process of heating up, some large-scale passenger car manufacturer both in this way.


    Iv. Practical operation

    With the increasing production of loaders, the measures taken by our company are as follows:

           1) After cleaning and removing oil, the loader should take the way of natural cooling and drying, pay attention to maintain balanced production, if the weather is bad, use the night time to dry.

           (2) When the production line is in operation, the water-mark drying room does not work, and most of the shielding work is carried out offline.

           (3) All the doors of the room are closed when painting, in order to save time. In this way, it is easy to cause the paint mist to fly to the shielding room and leveling room next to the paint room.

           (4) A new 720m2 hangar will be built for parking the loader sprayed with paint, and the painting and decoration work will be carried out here; When the temperature is low, use the evening time to dry.

           (5) Make some baffles of shield glass with tin sheet to save the time of shield glass.

        

           Through the above measures, the company has ensured the painting workshop in the case of no night shift, Nissan 15-20 loaders. Of course, the above measures are a little harmful to the production line. In order to improve the problem of drying in winter, the company plans to build a new drying room for drying the paint of the whole machine, and prepare to move the water-mark drying room below the line to play its role.

    Service hotline

    020-36860788

    WeChat

    Feedback

    Feedback

    主站蜘蛛池模板: 妺妺窝人体色www看人体| 欧美熟妇另类久久久久久多毛| 亚洲成av人在线观看网址| 性生交片免费无码看人| 精品无码久久久久国产电影| 国产高清视频在线观看97| 日本三级韩国三级欧美三级| 国产成年无码v片在线| 亚洲中文字幕乱码av波多ji| 果冻传媒亚洲区二期| 亚洲第一av导航av尤物| 国产99在线 | 亚洲| 97久久综合亚洲色hezyo| 男女18禁啪啪无遮挡激烈| 日韩精品成人av在线观看| 伊人久久亚洲综合影院首页| 国产成人亚洲综合色就色| 国产精品yy9299在线观看| 久久久久av综合网成人| 国产亲子乱弄免费视频 | 女人和拘做受全程看视频| 亚洲中文无码av永久app| 无码专区 丝袜美腿 制服师生| 国色天香社区视频在线| 美女黄网站18禁免费看| 国产丰满人妻一区二区| 涩涩鲁亚洲精品一区二区| 日本在线视频www色| 久久精品国产99精品国产亚洲性色 | 亚洲成av人片久久| 久久综合狠狠综合久久综合88| 国产又爽又黄又爽又刺激| 欧乱色国产精品兔费视频| 10000部拍拍拍免费视频| 午夜福利电影| 日本日本乱码伦视频在线观看| 免费无码成人av在线播| 男男啪啪激烈高潮cc漫画免费| 丰满人妻一区二区三区视频53| 国产成人无码激情视频| 377p日本欧洲亚洲大胆张筱雨 |